Training walkthrough — manufacturer sign-off to first install
Use this walkthrough with a supervisor and the visual installation atlas. It teaches the sequence; it does not certify a cabinet. Allow time for questions and faults rather than promising a fixed installation time.
Training environment: use approved staging fixtures or a disconnected training tablet. Label simulated results TRAINING — NOT CABINET ACCEPTANCE. Do not replay laptop-made diagnostics into production, create live sample serials, or present a simulated certificate as shipping proof. For a real cabinet, follow the physical acceptance guides below with authorized people.
Part 1 — The factory line

- Show how to match the cabinet serial and approved APK, check its SHA-256 and signer, and identify the correct hardware family. The staff Operator app belongs on the staff device; it does not drive the vending controller.
- Use the training device's authorized access handover to open its service menu. Demonstrate Android Back, Home, Settings and Wi-Fi using the Android basics guide.
- Explain device enrolment, arming and a matching cloud heartbeat. Do not display credentials or treat an Operator claim as cabinet authentication.
- Walk the diagnostic screens. Mark an absent controller or unperformed test as untested; never make a tablet look like a passed physical cabinet.
- Show sanitized examples of a rejected report, an eligible diagnostic and its Android handwritten acceptance certificate. Explain that the Partner FAT factory signature is a separate record covering observed physical subsystem tests. A real shipment requires the complete manufacturer guide, both manufacturing records and the handover pack.
Read Manufacturer acceptance (中文) and detailed Android sign-off.
Part 2 — First install at the venue

- Inspect a sample traveller and explain the physical delivery checks. Use the cabinet manufacturer's actual electrical and placement instructions.
- Demonstrate Wi-Fi and return to the kiosk on the training device. A Wi-Fi icon alone is not a matching authenticated gateway heartbeat.
- Open the approved Operator interface using your own named account. Verify the authorized tenant, machine list and supported permissions. Have the authorized owner perform unavailable actions; never borrow passwords or MFA codes.
- On an isolated staging fixture, demonstrate claim, explicit address-match review and the separate on-site installation confirmation. Do not submit a physical-presence declaration for a real cabinet you are not standing at.
- Demonstrate reader identification, supported QR-only setup, real product mapping and selected fill quantities. Keep payment demonstrations in the approved test environment; a simulated transaction is not real settlement.
- Explain that go-live requires readiness, reviewed address, separate on-site evidence and physical acceptance. The operator's delivery acceptance is separate from both manufacturer signatures. An incomplete check is a reason to resolve the issue, not force the state green.
- Rehearse finding the original order after a lost reply or failed vend. A refund owed is different from a refund returned. Do not charge again merely because the first result is uncertain.
Complete First-time install on a real cabinet with its operator and qualified installer before opening it to shoppers.
Part 3 — What the demonstration proves

| Demonstration | What still needs physical evidence |
|---|---|
| Android navigation and Wi-Fi screens | Actual ROM, lockdown, boot and network recovery |
| Diagnostic and signature screens | Every lane, controller, sensor, fitted accessory and both factory signatures |
| Operator setup and readiness | Correct ownership, address, witnessed on-site placement and delivery acceptance |
| Simulated checkout and refund states | Real destination-profile charge, correct product drop, settlement and refund |
| Update controls | Approved artifact on the actual cabinet, identity preservation and recovery |
Reset between demos
Reset only the authorized isolated training fixtures using their approved reset procedure. A production serial remains a production identity. Do not manufacture another live serial to evade an existing ownership or sign-off state. Export a training checklist under a clearly labelled training identifier and keep it separate from real cabinet handovers.